Skip to main content
Colorado General AssemblyToggle Main Menu
Agency NameToggle Agency Menu

09BBE9103851980787258A13005DD1E4 Hearing Summary




PUBLIC
BILL SUMMARY For PRESENTATION FROM THE KEMPE FOUNDATION AND KEMPE CENTER

INTERIM COMMITTEE  COLORADO'S CHILD WELFARE SYSTEM INTERIM STUDY COMMITTEE
Date Aug 22, 2023      
Location Old State Library



Presentation from the Kempe Foundation and Kempe Center - Committee Discussion Only

11:04:47 AM  
Michelle Davis, Director
of Justice, Equity, Diversity, and Inclusion, Kempe Foundation; Dr. Suzanne
Kerns, Director of Transformative Research, Kempe Center; Kendall Marlowe,
Public Policy Consultant, Kempe Foundation; and Dr. Kathryn Wells, Executive
Director, Kempe Center, presented to the committee. The presentation included
information on the brain science around child maltreatment, overrepresented
populations in the child welfare system, improving the quality of the child
welfare workforce, Colorado's child mental health challenges, improving
the implementation of evidence-based child maltreatment prevention programs,
and their legislative proposals. A copy of their presentation and a handout
were provided to the committee (Attachments K and L).






August 2024 Special Session Deadlines and Guidelines are available here

RFP Conduct the 2025 Colorado Property Assessment Study (submit by 3:00 pm, 9/13/2024). Details

The effective date for bills enacted without a safety clause is August 7, 2024, if the General Assembly adjourns sine die on May 8, 2024, unless otherwise specified. Details