2019 Investor-owned Utility Review Interim Study Committee Final Report
Final Report to the Colorado General Assembly by the Investor-owned Utility Review Interim Study Committee.
Second Regular Session | 74th General Assembly
Colorado General AssemblyFinal Report to the Colorado General Assembly by the Investor-owned Utility Review Interim Study Committee.
During the 2017 legislative session, the General Assembly considered measures concerning electric demand side management for investor-owned utilities, energy infrastructure, and consumer protections.
Legislative Emergency Preparedness, Response, and Recovery Final Report for 2017.
Presented to the County Courthouse and County Jail Funding and Overcrowding Solutions Interim Study Committee at its July 2017 committee.
The 2016 final report provides a complete summary of all LEPRRC activity in 2016.
Presented to the Select Committee on Energy and the Environment at its January 19, 2017, meeting.
Presented to the Select Committee on Energy and the Environment at its January 19, 2017, meeting.
Presented to the Joint Senate Agriculture House Transportation Committee at its January 10, 2017, meeting.
Presented to the Joint Senate Agriculture House Transportation Committee at its January 10, 2017, meeting.
The effective date for bills enacted without a safety clause is August 7, 2024, if the General Assembly adjourns sine die on May 8, 2024, unless otherwise specified. Details