2019 Investor-owned Utility Review Interim Study Committee Final Report
Final Report to the Colorado General Assembly by the Investor-owned Utility Review Interim Study Committee.
First Regular Session | 75th General Assembly
Colorado General AssemblyFinal Report to the Colorado General Assembly by the Investor-owned Utility Review Interim Study Committee.
This memorandum memorializes the process for requesting and preparing greenhouse gas emissions reports (reports) pursuant to Section 2-2-322.3, C.R.S. It outlines the number of reports per session, the process for requesting reports, the preparation and timing of reports, and the preparation of...
Summary report for the Energy Legislation Review Interim Study Committee.
Summary report for the Investor-owned Utility Review Interim Study Committee.
Summary report for the Transportation Legislation Review Committee.
Final Report to the Colorado General Assembly by the Sales and Use Tax Task Force.
Summary report for the Pension Review Commission.
Summary report for the Zero Waste and Recycling Interim Study Committee.
Summary Report for the Water Resources Review Committee to the Legislative Council.
Report No. 2019-TE20
Note: A more recent evaluation was issued in December 2024. Click HERE to access the December 2024 report.
During the 2019 legislative session, the General Assembly considered a variety of issues related to energy efficiency, renewable energy, public utilities
...The effective date for bills enacted without a safety clause is August 6, 2025, if the General Assembly adjourns sine die on May 7, 2025 (unless otherwise specified). Details
Our website is currently undergoing a redesign in order to provide a better experience for everyone. View the Beta site